Connecting Container #1 – Details

This is the 1st (and currently, only) Connecting Container on the DDRR. At this time (04/29/24) there are (2) Scene Containers connected to it, the “Randallville/Nicholas” Container and the “Six Mule/Lumber” Container. The Randallville Scene is 100% complete (on the right side of the Randallville/Nicholas Container) and I am currently working on the Nicholas Scene (on the left side of that Container). The Nicholas Trackwork is done and Track Wiring will be next. The Six Mule/Lumber Container is in place but has not been “Built-Out” and is currently storing the Modules that were salvaged from the old Layout. After the Nicholas Scene Track Wiring is done, I will move on to building a Staging/Storage Yard in the Connecting Container and then connect the (2) Containers via a Double Track Loop (there will be a Lift or Swing Gate at the Front Door of the Connecting Container). After the Six Mule/Lumber Container is done it will be added to the Loop.